Exilles hydropower plant

The project

The project involves the construction of a run-ofriver hydroelectric plant, with its main components being the intake structure, the diversion channel, the loading basin, the penstock, the powerstation, and the discharge channel. To stabilize the slope and safely excavate for the power station, variable-height anchored micropile walls have been implemented. Frosio Next has provided services including the review of the executive project, the drafting of technical specifications and bidding documents,project management, safety coordination during the design and execution phases (CSP/CSE), as well as assistance during the plant commissioning.

Services provided by Frosio Next:

  • Executive project review
  • ELMEC works – contract specifications
  • Works supervision
  • Safety coordination during design phase
  • Safety coordination during execution phase
  • Equipment tests assistance
  • Plant Start-up assistance
PROJECT’S FEATURES
DURATION

2021

LOCATION

Exilles (Turin province), Italy

ASSIGNMENT

EXECUTIVE PROJECT REVIEW
ELMEC WORKS – CONTRACT SPECIFICATIONS
WORKS SUPERVISION
SAFETY COORDINATION DURING DESIGN PHASE
SAFETY COORDINATION DURING EXECUTION PHASE
EQUIPMENT TESTS ASSISTANCE
PLANT START-UP ASSISTANCE

NAME OF THE PROJECT

New Exilles hydropower plant

MAIN DATA OF THE PLANT
INSTALLED CAPACITY

1319 kW

RATED HEAD

515,78 m

MAX PLANT FLOW RATE

0,55 m3/s

Our projects

Contact us

Do you want to start a great project with us?
Fill the form and get in touch with us.

I hereby acknowledge that I have read and understood the privacy policy of Frosio Next S.r.l..
I hereby authorize the use of my personal data for marketing puropses.